ENERGY SAVING · ENGLISH CASE LIBRARY

Field experience.
Evidence you can interpret.

All 88 English cases cover operating diagnosis, baselines, field comparisons and simulation. Each case states what the evidence supports.

The Korean library contains 88 cases: CASE01–82 are linked to the current Korean book; CASE83–88 are website extensions. This English edition contains all 88 cases. Browse the full Korean library ↗

88 English cases

CASE11 · Manufacturing

Reported field result

Scaling utility optimization from one plant to six factories

A two-year semiconductor/display program first applied utility improvements at a demonstration plant and then expanded real-time performance diagnosis and operating guidance across six factories.

KRW 1.62 billion/yearReported first-year savings from 11 applied items
Read the case

CASE18 · Manufacturing

Potential

Compressed-air UPI and control optimization in a chemical plant

Low- and high-pressure compressor systems were benchmarked using specific electricity consumption, unit staging, pressure and BOV/IGV behavior. Additional savings opportunities were identified even though baseline performance was already better than the peer average.

Approximately 5.1%Combined electricity savings potential
Read the case

CASE26 · Water & wastewater

Field comparison

Verifying inlet-pump efficiency after replacement

Five-minute and monthly operating data were used to compare wastewater throughput and electricity before and after inlet-pump replacement. Flow-normalized performance improved while the reported treatment capacity remained broadly comparable.

6.8% / 8.9%Reported flow-normalized energy-intensity improvements
Read the case

CASE40 · District heating

Baseline-based M&V

Weather-adjusted M&V for smart district-heating operation

Heating degree days (HDD) and historical heat-meter data establish an adjusted baseline for a residential district-heating system. Smart supply-temperature control is evaluated against that baseline and cross-checked with household heating consumption.

133 Gcal / approximately 6.1%Reported three-month HDD-adjusted savings
Read the case

CASE53 · Manufacturing

Field data / Test & Adjust

Chilled-water setpoint optimization through Test & Adjust

A manufacturing chiller-system case examines whether raising the chilled-water leaving-temperature setpoint can improve system efficiency while satisfying process, HVAC and dehumidification requirements.

System kW/RTPerformance criterion; no quantified savings rate published
Read the case

CASE55 · Manufacturing

Potential

Re-matching chilled-water pumps to measured flow and head

Actual chilled-water demand and pump operating points are checked against original sizing. Control changes, impeller adjustment and pump replacement are compared at the required service level.

KRW 70 million/yearExpected benefit of demand-matched pump specification
Read the case

CASE65 · Manufacturing

Field test result

Choosing boilers by measured fuel per tonne of steam

Two equal-capacity boilers are compared through actual changeover operation. Fuel intensity, steam load and supply conditions support efficient priority selection while the annual benefit retains its historical calculation basis.

Approximately 5%Reported fuel-intensity reduction: unit #3 → #2
Read the case

CASE84 · Manufacturing

Field test / Partial M&V

Comparing three extrusion tests when production conditions change

Three anonymized tests distinguish matched-condition electricity reduction from production-normalized intensity improvement. The comparison screens repeatable operating opportunities without claiming annual savings.

26.15% / 18.65%Reported intensity improvements: Test 2 / Test 3 vs Test 1
Read the case