CASE15 · Manufacturing · CDA and chiller utilities

Building a metering-led utility optimization plan for electronic components

Annual CDA and cooling records support a staged proposal: an initial compressor improvement followed by additional utility optimization. Sensor consistency is a prerequisite for credible performance comparisons.

01 · CASE ANALYSIS

Operating challenge

CDA and chillers together used approximately 80.03 GWh/year. Flow and temperature measurement quality needed to be established before calculating equipment-level savings.

The proposal reviewed demand patterns, air discharge/venting, unit controls, chiller outlet temperatures, staging, pumps, cooling towers and line-level cooling balance.

02 · CASE ANALYSIS

Data and reported performance

CDA used approximately 42.36 GWh/year to produce 245.47 million m³, giving annual UPI around 0.173 kWh/m³. Average compressor staging was 8.3 units, ranging from 7 to 10; average seasonal airflow was approximately 28,000 m³/h.

Three cooling circuits used approximately 37.67 GWh/year. Their reported UPI values were 0.667/0.622/0.706 kWh/RT, loads 70%/70%/52% and average unit counts 4.2/1.9/1.3.

Annual utility scale
BoundaryElectricity / outputPerformance
CDA42.36 GWh; 245.47 million m³0.173 kWh/m³
Cooling37.67 GWhThree major circuits
Combined80.03 GWhAnnual electricity, not savings

03 · CASE ANALYSIS

Staged improvement proposal

The first compressor step targets 5% against the late-December 2017 average. The monetized second step targets an additional 3% after that initial compressor improvement and an additional 3% in the cooling system.

Install missing equipment flow meters, calibrate existing sensors, implement monitoring and operating scenarios, then train operators and perform data-based optimization. The proposed project lasts about twelve months.

04 · CASE ANALYSIS

Expected economics and M&V

The source estimates approximately KRW 92 million/year from additional compressor optimization and KRW 87 million/year from cooling, rounded to approximately KRW 180 million/year combined.

The proposal states approximately KRW 300 million for system installation/consulting and approximately two years payback on its investment assumptions, including sensor installation. Savings must be verified using calibrated energy, flow, cooling load, pressure, weather and production records.

Staged proposal
StepReferenceExpected effect
Initial CDA optimizationLate-December 2017 mean power5% target
Additional CDA optimizationApproximately 102 MWh/day × 95%Additional 3%; KRW 92 million/year
Additional cooling optimizationApproximately 93 MWh/dayAdditional 3%; KRW 87 million/year
Combined additional benefitProposal reference approximately 195 MWh/dayApproximately KRW 180 million/year

05 · CASE ANALYSIS

Engineering lesson

Sequential targets must be described in sequence. The initial compressor 5% and later utility 3% are not an additive verified 8% site saving.

APPLY TO YOUR SITE

Connect your operating data to an actionable energy strategy.

Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.