CASE13 · Manufacturing · Multi-site utilities
Benchmarking chiller and CDA performance across four production facilities
Seasonal comparisons of low-/high-temperature cooling and compressed dry air use best-performing operation as a benchmark. Staging and bypass analysis identifies a multi-site utility improvement portfolio.
01 · CASE ANALYSIS
Operating challenge
Four facilities differed in UPI, load and the gap between actual and required units. Some chilled-water header bypass valves remained highly open for long periods.
The analysis used the best comparable operating performance within or between facilities as a target, with low-temperature (LT), high-temperature (HT) and CDA boundaries kept separate.
02 · CASE ANALYSIS
Data and benchmarking
Seasonal energy costs, chiller/pump UPI, CDA UPI, load ratios, actual/required unit counts and header bypass openings were compared. Reported annual costs totaled approximately KRW 104.496 billion.
The benchmark estimates improvements of 4.8% for LT cooling, 1.6% for HT cooling and 4.7% for CDA. Displayed average UPI differences are rounded and need not reproduce those rates exactly.
| System | Mean UPI | Potential reduction / rate | Cost potential |
|---|---|---|---|
| LT chillers + chilled-water pumps | 0.59 kWh/RT | 0.03 kWh/RT; 4.8% | KRW 565 million/year |
| HT chillers + chilled-water pumps | 0.47 kWh/RT | 0.01 kWh/RT; 1.6% | KRW 430 million/year |
| CDA | 0.119 kWh/m³ | 0.006 kWh/m³; 4.7% | KRW 3.107 billion/year |
| Combined | — | Approximately 3.9% of utility cost | KRW 4.102 billion/year |
03 · CASE ANALYSIS
Operating opportunities
Reported average operating margins across the facilities were approximately 2.9 LT chillers, 1.7 HT chillers and 7.3 compressors. Some LT bypass openings averaged about 64% and 37%.
Reduce unnecessary bypass and parallel operation only within minimum-flow, reserve and production-stability requirements. Select compressor combinations using demand, pressure and equipment efficiency together.
04 · CASE ANALYSIS
Measurement and verification
The approximate KRW 4.102 billion/year is the sum of reported LT, HT and CDA cost potentials. It is not a confirmed multi-site saving.
Cooling baselines should account for RT, weather and water temperatures; CDA baselines should account for airflow demand, pressure, production and staging. Verify each facility under comparable conditions.
| System | Actual units | Required units | Reported margin |
|---|---|---|---|
| LT cooling | 11.9 | 9.0 | 2.9 |
| HT cooling | 21.5 | 19.7 | 1.7 (reported) |
| CDA | 53.9 | 46.6 | 7.3 |
| CDA load | Airflow-based: 87% | Power-based: 94% | Different indicator definitions |
05 · CASE ANALYSIS
Engineering lesson
A benchmark reveals where to investigate, but does not prove that another site can reproduce the best UPI. Loads, reserve requirements and process constraints must be evaluated first.
APPLY TO YOUR SITE
Connect your operating data to an actionable energy strategy.
Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.