CASE49 · Buildings · Design-alternative simulation

Testing eighteen building-design variables against one virtual-office baseline

Single-variable model runs compare envelope, thermal mass, lighting, HVAC and plant choices under consistent assumptions. Results reveal both favorable and unfavorable annual energy-cost changes.

01 · CASE ANALYSIS

Design question

A virtual office baseline allows one variable to change while weather, schedules and other model assumptions remain fixed. The comparison identifies sensitivity rather than promising a universal saving.

Eighteen alternatives covered architectural, lighting, HVAC, plant, control and tariff variables.

02 · CASE ANALYSIS

Four initial comparisons

Wall insulation from 70 to 90 mm produced a near-zero cost change. Floor weight from 105 to 45 kg/m² increased cost by approximately 1.1%.

Lighting density from 30 to 10 W/m² reduced modeled cost from approximately KRW 3,114 million to KRW 2,550 million/year. A distributed chiller configuration reduced cost by approximately 1.6%.

Four initial model cases
VariableChangeAnnual cost change
Wall insulation70 → 90 mmApproximately +0.0%; +KRW 1 million
Floor weight105 → 45 kg/m²+1.1%; +KRW 34 million
Lighting density30 → 10 W/m²−18.1%; −KRW 564 million
Chiller arrangement4,300 RT × 1 → 2,800 / 1,200 / 800 RT combination−1.6%; −KRW 50 million

03 · CASE ANALYSIS

Interactions can reverse intuition

AHU heating supply temperature from 29 to 25°C increased modeled cost 5.9%; cooling supply temperature from 12 to 15°C increased it 2.3%. These results require examination of airflow, zone loads and plant interactions.

Daylighting reduced modeled cost by 14.3%, approximately KRW 445 million/year. Its lighting and cooling interactions differ from simply increasing glazing area.

04 · CASE ANALYSIS

Broader scenario portfolio

The source includes thermostat changes, economizer operation, glazing, curtains, outdoor-air conditions, pump variable speed, ice storage and chilled-water temperature. The reported outdoor-air input is 36 → 20 m³/person; its time basis is not supplied here and must be checked in the original model.

Run an integrated model for the selected measures. Independent scenario percentages cannot be added because their effects can overlap.

Remaining single-variable scenarios
VariableChangeCost change
Heating setpoint22 → 21°C−0.3%
Cooling setpoint26 → 27°C−0.6%
AHU heating outlet29 → 25°C+5.9%
AHU cooling outlet12 → 15°C+2.3%
EconomizerDisabled → enabled−0.7%
Window ratio63% → 40%−1.7%
Glazing SC0.33 → 0.75+9.3%
CurtainsNone → 50% application−1.0%
Electricity tariffOption II → I−0.8%
Outdoor-air input36 → 20 m³/person (source notation)−2.4%
Pump variable-speed driveAbsent → present−1.1%
Ice storageAbsent → present−3.1%
DaylightingAbsent → present−14.3%
Chilled-water outlet6.7 → 8°C−0.3%

05 · CASE ANALYSIS

Design decision and evidence

Check lighting service, indoor air quality, comfort, construction feasibility, investment and maintenance alongside modeled energy cost. A cost minimum is not automatically a feasible design.

These results belong to a virtual office, not an actual metered project. Changing a tariff can change cost without changing energy consumption.

APPLY TO YOUR SITE

Connect your operating data to an actionable energy strategy.

Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.

Discuss your project All English cases