Operating challenge

The facilities already operated their utilities at a relatively high performance level. Additional opportunities required examining interacting variables rather than relying on a single equipment change or setpoint adjustment.

Demand-supply balance, load sharing, flow, temperature, pressure, valves, control logic and equipment combinations were considered together.

02 · CASE ANALYSIS

Proposal basis and site priorities

Two production sites had combined annual utility costs of approximately KRW 14.04 billion. The proposal estimated approximately KRW 634 million/year, or 4.5%, in further improvements.

Site B was prioritized because its larger utility cost and approximately KRW 476 million/year expected benefit gave it greater project significance. Rollout to other sites was proposed after verifying performance.

Two-site proposal
SiteAnnual utility costExpected rateExpected saving
Site AApproximately KRW 3.27 billion4.8%KRW 158 million/year
Site BApproximately KRW 10.78 billion4.4%KRW 476 million/year
CombinedApproximately KRW 14.04 billion4.5%KRW 634 million/year

03 · CASE ANALYSIS

Optimization approach

The plan begins with field surveys, calibration of existing instruments, supplementary metering and data integration. Monitoring and data-quality validation support real-time performance diagnosis.

Operating measures include matching supply to production demand, balancing parallel equipment, selecting efficient units, reducing unnecessary bypass or concurrent operation, improving weak equipment and optimizing setpoints/control logic within process requirements. Operator training supports continued improvement.

04 · CASE ANALYSIS

Measurement and verification

At the priority site, the cooling proposal estimates 3.0% and KRW 206 million/year, while compressed air estimates 6.7% and KRW 270 million/year. These are pre-implementation expectations.

Verify against baselines incorporating production, cooling/airflow demand, weather and operating units. The report does not establish a confirmed 4.5% field saving or demonstrated AI performance.

Priority-site utility proposals
UtilityAnnual costExpected rateExpected saving
Chiller systemKRW 6.77 billion3.0%KRW 206 million/year
Compressed airKRW 4.00 billion6.7%KRW 270 million/year

05 · CASE ANALYSIS

Engineering lesson

When obvious improvements are exhausted, coordinated operating relationships can still identify opportunities. The proposal must remain distinct from results obtained after implementation.

APPLY TO YOUR SITE

Connect your operating data to an actionable energy strategy.

Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.

Discuss your project All English cases