CASE12 · Manufacturing · Cooling, HVAC and compressed air

Finding utility savings through integrated cooling, HVAC and compressed-air data

Seasonal and one-minute records connect COP, staging, AHU filter pressure and compressor unloading. The report estimates utility savings while keeping production-equipment electricity outside the improvement boundary.

01 · CASE ANALYSIS

Operating challenge

The cooling system ran an average of about 2.1 chillers against 1.2 calculated as required. AHU filter pressure and outdoor-air damper settings varied significantly between equipment and seasons.

Compressor demand, discharge pressure and loading/unloading also varied. One-minute analysis exposed short loss peaks that monthly averages concealed.

02 · CASE ANALYSIS

Data and performance diagnosis

Chiller load, power, COP/UPI, water temperatures/flows, pump/tower staging, bypass valves and header pressure were analyzed alongside AHU filter ΔP, outdoor-air dampers and return temperature/humidity.

Reported cooling-system UPI averaged about 0.84 kWh/RT, COP 4.20 and load 55%. Some filter pressures reached 19–22 mmAQ versus 12–13 mmAQ elsewhere. The additional CDA analysis reported UPI around 0.126 kWh/m³, load 81%, mean loss 3.1% and a maximum instantaneous loss of 31.7%.

Annual electricity boundaries
BoundaryBaseline electricity
AHUs1,284,297 kWh
Cooling system4,575,524 kWh
Compressed air3,313,220 kWh
Other utilities1,230,530 kWh
Utilities excluding process10,403,571 kWh
Whole site including process31,370,955 kWh

03 · CASE ANALYSIS

Proposed improvement portfolio

The main opportunity was cooling-system optimization: required-unit operation, efficient-unit priority and coordinated pumps/towers. Smaller opportunities concerned AHU filters and outdoor-air controls, compressor combinations/pressure and other utilities.

The portfolio estimates 444,832 kWh/year, approximately KRW 49,821,132/year. This represents 4.3% of utility electricity or 1.4% of the whole-site electricity when process equipment is included.

04 · CASE ANALYSIS

Measurement and verification

These are 2018-baseline potential estimates. Build an adjusted baseline using cooling load, production, weather, compressed-air demand and operating hours before comparing implementation results.

A 31.7% instantaneous system-loss peak is a diagnostic observation, not a site annual savings rate.

Reported savings portfolio
BoundaryPotentialRate
AHUs12,843 kWh/year1.0%
Cooling system320,287 kWh/year7.0%
Compressed air99,397 kWh/year3.0%
Other utilities12,305 kWh/year1.0%
Utility total444,832 kWh/year4.3%
Whole-site equivalent444,832 kWh/year1.4%

05 · CASE ANALYSIS

Engineering lesson

Use the same numerator with the correct denominator. The utility-only 4.3% and whole-site 1.4% describe the same estimated saving under different accounting boundaries.

APPLY TO YOUR SITE

Connect your operating data to an actionable energy strategy.

Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.

Discuss your project All English cases