CASE07 · Manufacturing · Sintering furnaces

Prioritizing efficient sintering furnaces under matched production profiles

Historical glass-sintering data were normalized by the main sintering profiles. Reassigning production to better-performing furnaces was simulated while keeping loading and process conditions comparable.

01 · CASE ANALYSIS

Operating challenge

Energy intensity depends on sintering duration, loading, good-product yield and furnace performance. The study focused on changing operating priority without equipment modifications.

Different products and profiles can obscure equipment differences. The analysis first selected the most frequent process-duration groups before ranking furnaces.

02 · CASE ANALYSIS

Data and simulation method

The source contained 324 days of operation. After excluding abnormal energy and loading records, 118 small-furnace runs and 733 large-furnace runs remained. Main profiles were 151/154 hours for small furnaces and 110/112/114 hours for large furnaces.

UPI was electricity divided by loaded mass. Within the selected profiles, loaded mass showed no clear correlation with electricity per run, so mean kWh/run was used to rank furnaces. Production counts were then assigned preferentially to better-ranked equipment while holding average duration, mass and loading comparable.

Normalized comparison method
IndicatorDefinition or condition
UPIElectricity (kWh) / loaded mass (kg)
Equipment rankingMean electricity per sintering run within the selected profile
Scenario energySum of ranked-furnace mean kWh/run × allocated run count

03 · CASE ANALYSIS

Modeled operating scenarios

The small- and large-furnace scenarios were evaluated separately and then combined. The source reports 101,145 kWh of modeled savings over the analyzed records, worth approximately KRW 10.92 million at the historical electricity price.

Applying the combined 3.1% rate to approximately 8,015,930 kWh/year gives about 248,494 kWh/year and a maximum estimated KRW 26.83 million/year. These are annualized estimates under ideal scheduling conditions.

04 · CASE ANALYSIS

Measurement and verification

Actual scheduling must respect product profiles, furnace availability, production commitments and quality. Compare electricity and UPI under equivalent profiles before and after changing operating priority.

The reported rates are simulation results from historical data, not post-improvement metered savings. Real scheduling constraints may reduce the achievable financial benefit.

Reported modeled comparison
BoundaryHistorical energy / UPIScenario energy / UPISaving
Small furnaces286,527 kWh; 27.99 kWh/kg264,191 kWh; 25.81 kWh/kg7.8%
Large furnaces2,983,691 kWh; 11.59 kWh/kg2,904,881 kWh; 11.28 kWh/kg2.6%
Combined3,270,218 kWh; 12.22 kWh/kg3,169,073 kWh; 11.84 kWh/kg3.1%

05 · CASE ANALYSIS

Engineering lesson

Matched-profile comparison is essential before using equipment rankings. A lower-energy run caused by a different recipe does not establish better furnace performance.

APPLY TO YOUR SITE

Connect your operating data to an actionable energy strategy.

Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.

Discuss your project All English cases