CASE35 · Buildings · eQUEST / Appendix G

Comparing LEED energy cost and site energy in a mixed-use building model

A historical ASHRAE 90.1-2004 Appendix G comparison models the proposed mixed-use design against four rotated baseline buildings. District-heat absorption cooling improves cost performance while increasing site energy.

01 · CASE ANALYSIS

Performance-rating objective

Translate architectural, mechanical and electrical drawings into the proposed model. Generate a separate baseline under the historical rating method and compare annual utility cost and peak demand.

Functional use, occupancy and process loads remain comparable so that design effects can be interpreted.

02 · CASE ANALYSIS

Baseline construction and quality checks

The source used Climate Zone 4A, 40% baseline window-to-wall ratio, sizing multipliers of 1.15 for cooling and 1.25 for heating, and rotations of 0°, 90°, 180° and 270°.

Review verification reports, unmet load hours, end uses, peak demand and plant loads. These describe the project method at that time rather than current LEED submission rules.

Historical proposed/baseline choices
ElementProposedBaseline
EnvelopeActual U-factor, SHGC and glazing areaHistorical minimum performance; WWR 40%
LightingActual space-level LPDHistorical space-by-space LPD
Office HVACVAV with reheat and four-pipe FCUSystem 7: VAV with reheat
Hotel HVACFour-pipe FCUSystem 2: PTHP
CoolingDistrict-heat absorption; COP 0.73Electric centrifugal; COP 6.1

03 · CASE ANALYSIS

Why energy sources change the result

The proposed design used single-effect district-heat absorption chillers with COP 0.73; the baseline used water-cooled centrifugal electric chillers with COP 6.1.

Reduced electric cooling energy does not establish reduced total site energy when purchased heat increases. Fan, pump and heat-rejection loads also require separate review.

04 · CASE ANALYSIS

Rating result

Proposed annual energy cost was approximately USD 3.574 million versus USD 3.721 million for the average baseline, yielding approximately 4.0% improvement. Process energy cost was approximately 25.27% of baseline cost.

Proposed site energy was approximately 139,539 MBtu/year versus 102,348 MBtu/year, approximately 36.3% higher. The modeled cost benefit and site-energy increase are both retained.

Annual modeled comparison
IndicatorProposedBaseline
Energy costUSD 3.574 millionUSD 3.721 million
Site energy139,539 MBtu102,348 MBtu
Interior lighting2.78 GWh4.64 GWh
Electric space cooling0.12 GWh2.29 GWh
Interior fans3.07 GWh3.27 GWh
Pumps2.36 GWh1.16 GWh
Heat rejection0.286 GWh0.163 GWh
Purchased heat for cooling56,494 MBtuNot applicable

05 · CASE ANALYSIS

Engineering interpretation

Interior lighting fell approximately 40.1%, while pumps and heat rejection increased approximately 103% and 76%. These opposing changes make end-use analysis essential.

A simulated rating is a design comparison, not a measured operating result or confirmation of certification.

APPLY TO YOUR SITE

Connect your operating data to an actionable energy strategy.

Discuss the measurement boundary, data quality, operating constraints and verification approach for your facility.

Discuss your project All English cases